Practical knowledge on leasing risks, BOQ, tendering and project closeout.

Request a proposal
Pre-lease site review

Seven checks before signing a store lease

Consider incoming power, fit-out constraints, existing M&E, operational flow, access, handover conditions and likely adaptation costs.

Practical takeaway: Use a standard checklist and risk register before committing to opening dates.

Cost & BOQ

Why do contractor quotes differ for the same site?

Scope definitions often differ: units, materials, demolition, retained works, electrical interfaces and access conditions.

Practical takeaway: Compare like-for-like work quantities and exclusions.

Handover & final account

What evidence should you keep from day one?

Approved drawings, site photos, change instructions, inspections, measured work and supporting records should share a project reference.

Practical takeaway: Reliable records reduce closeout disagreement.

General operational guidance only; site-specific professional assessment may be required.

FUTURE DIRECTION

Practical knowledge & digital tools for construction teams

TSC plans to develop document templates, training resources and tools for BOQ, subcontract administration, inspection and final accounts. These are planned resources, not products currently offered for purchase.

Suggest a topic

Planning a new store, refurbishment or lease handback?

Share your initial requirements and we can discuss the right scope and next steps.

Request a proposal
Call usZalo