Pre-lease site review
Seven checks before signing a store lease
Consider incoming power, fit-out constraints, existing M&E, operational flow, access, handover conditions and likely adaptation costs.
Practical takeaway: Use a standard checklist and risk register before committing to opening dates.
Cost & BOQ
Why do contractor quotes differ for the same site?
Scope definitions often differ: units, materials, demolition, retained works, electrical interfaces and access conditions.
Practical takeaway: Compare like-for-like work quantities and exclusions.
Handover & final account
What evidence should you keep from day one?
Approved drawings, site photos, change instructions, inspections, measured work and supporting records should share a project reference.
Practical takeaway: Reliable records reduce closeout disagreement.
General operational guidance only; site-specific professional assessment may be required.